When starting a boiler,the procedure of ignition and water feeding should draw our attention.
1.the water feed to the boiler should be processed.It is suggested that every set of boiler be equipped with a water processing system so that the steam boiler run smoothly without incrustation.
2.The water temperature should not be too high, preventing that the boiler will not be heated evenly.the proper water temperature should be no more than 90℃in summer and 60℃ in winter.
3.The speed to feed water should not be too fast,especially when the water level is rather high. The time of water giving is about 1 hour in summer and 2hours in winter.
4.The water should feed to the lowest water level or 1/3 of the water indicator.because when the boiler is ignited,water temperature will raise,then the water level will continue to raise. When stopping inputting water,the level will be still. If the level lowers, the user should check the possible leakage of the boiler and remain it.
Keyword: Industry steam boiler,steam boiler,water level,feed waterSource: http://www.zgsteamboiler.com/news/several-notions-for-feeding-water-to.html
Pre: The blowdown method and requirements of steam boiler
Next: Ventilation methods of gas fired steam boiler
Packaging Detail:Wooden box package of several notions for feeding water to steam boiler
Delivery Detail:20-40 days after payment
We have over 70 years' experience of industrial steam boiler and autoclave, and we have a professional installation and after-sales staff for products.Take advantage of the most economical way to improve efficiency and operating flexibility, Get substantial savings on your fuel costs,Reduce all emissions for each K/W of electricity generated, including CO2.
Our industrial steam boiler manufactured strictly according to national and international standard. our products have approved ASME, IBR, ISO9001-2008, etc
All our company's products are 100% factory inspected to ensure the high quality.
We provide one year quality warranty service, please rest assured purchase.
ZG service ensures that this will not happen. During installation of industrial steam boiler, 1-2 experienced engineering and technical personnel will be sent for the site representative for technical tests and installation instructions free of charge; processing the various problems arising in the course timely while installing.
Established:In 1945
Number of Employees:above 1500 People
Our products:industrial horizontal steam boiler and hot water boiler(biomass boiler, gas boiler, oil boiler, coal boiler, etc), CFB boiler, power plant boiler, waste heating recovery boiler, Pressure Vessel(AAC autoclave, Curing tank,etc )
Factory Size (Sq.meters):400,000 square meters
Factory Location:Factory 1: Zhengzhou,,Henan, China. Factory 2: Xingyang,Henan,China
Number of R&D Staff:376 people
Export Percentage:30-40%
Total Annual Sales Volume:US$100 Million
Main Market:South America(Colombia, Venezuela, Guyana, Suriname, Ecuador, Peru, Brazil, Bolivia, Chile, Paraguay, Uruguay, Argentina and French Guiana), North America(Bahamas, Canada, Costa Rica, Cuba, El Salvador, Guatemala, Honduras, Haiti, Jamaica, Mexico, Nicaragua, Panama), Eastern Asia(Mongolia / Russia / North Korea / South Korea / Japan), Oceania(Australia, New Zealand, Fiji), Mid East(Bahrain, Egypt, Iran, Iraq, Israel, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, Syria, UAE and Yemen, Palestine, Algeria, Libya, Morocco, Tunisia and Sudan, Mauritania and Somalia), Africa(Egypt, Sudan, Libya, Tunisia, Algeria, Morocco, Ethiopia, Somalia, Kenya, Tanzania, Sierra Leone, Liberia, Cote d'Ivoire, Ghana, Togo, Niger, Nigeria, Cameroon, Gabon, Congo (Brazzaville), Zambia, Zimbabwe, Angola, Mozambique, Botswana, Namibia, South Africa), South Asia(Nepal, Bhutan, India, Pakistan, Bangladesh, Sri Lanka, Maldives) Southeast Asia(Vietnam, Laos, Cambodia, Thailand, Myanmar, Malaysia, Singapore, Indonesia, Brunei, the Philippines, East Timor) Domestic Market(China)
Source: http://www.zgsteamboiler.com/news/several-notions-for-feeding-water-to.html
Pre: The blowdown method and requirements of steam boiler
Next: Ventilation methods of gas fired steam boiler
Get Price And Support
Simply complete the form below, click submit, you will get the price list and a ZG boiler representative will contact you within one business day. Please also feel free to contact us by email or phone. ( * Denotes a required field ).
Email: [email protected]
Tele: +86 17719993430