1.The pressure rises rapidly and surpass the designed allowing pressure. At the moment, the pointer of the pressure indicator runover the red line.
2.The boiler’s overpressure interlock device send alarming signal.
3.The steam temperature reduced while the the steam flow increased.
1.Weaken or extinguish the flame, increase the fuel feeding and air (the boiler with an interlock can automatically stoped it.)or start the safe valve system.
2.Increase the feed water and strengthen the pollution discharging method. (keep the water at a normal level)
3. If the safe valve does not work or the pressure gage, the boiler should stopped immediately.
4.When the boiler is overpressure, depressurization method should be adopted. And the speed should not too slow. After the overpressure problems solved, the boiler should stop to protect the boiler. Such boiler parts as boiler body, assessory should be inspected.
Keyword: Industry steam boiler,
Source: https://www.zgsteamboiler.com/news/how-to-solve-the-over-pressure-problem-of-the-coal-fired-steam-boiler.html
Pre: The reasons for stoping the steam boiler urgently
Next: The measures for safe operation of the steam boiler
Packaging Detail:Wooden box package of how to solve the over pressure problem of the coal fired steam boiler
Delivery Detail:20-40 days after payment
We have over 70 years' experience of industrial steam boiler and autoclave, and we have a professional installation and after-sales staff for products.Take advantage of the most economical way to improve efficiency and operating flexibility, Get substantial savings on your fuel costs,Reduce all emissions for each K/W of electricity generated, including CO2.
Our industrial steam boiler manufactured strictly according to national and international standard. our products have approved ASME, IBR, ISO9001-2008, etc
All our company's products are 100% factory inspected to ensure the high quality.
We provide one year quality warranty service, please rest assured purchase.
ZG service ensures that this will not happen. During installation of industrial steam boiler, 1-2 experienced engineering and technical personnel will be sent for the site representative for technical tests and installation instructions free of charge; processing the various problems arising in the course timely while installing.
Established:In 1945
Number of Employees:above 1500 People
Our products:industrial horizontal steam boiler and hot water boiler(biomass boiler, gas boiler, oil boiler, coal boiler, etc), CFB boiler, power plant boiler, waste heating recovery boiler, Pressure Vessel(AAC autoclave, Curing tank,etc )
Factory Size (Sq.meters):400,000 square meters
Factory Location:Factory 1: Zhengzhou,,Henan, China. Factory 2: Xingyang,Henan,China
Number of R&D Staff:376 people
Export Percentage:30-40%
Total Annual Sales Volume:US$100 Million
Main Market:South America(Colombia, Venezuela, Guyana, Suriname, Ecuador, Peru, Brazil, Bolivia, Chile, Paraguay, Uruguay, Argentina and French Guiana), North America(Bahamas, Canada, Costa Rica, Cuba, El Salvador, Guatemala, Honduras, Haiti, Jamaica, Mexico, Nicaragua, Panama), Eastern Asia(Mongolia / Russia / North Korea / South Korea / Japan), Oceania(Australia, New Zealand, Fiji), Mid East(Bahrain, Egypt, Iran, Iraq, Israel, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, Syria, UAE and Yemen, Palestine, Algeria, Libya, Morocco, Tunisia and Sudan, Mauritania and Somalia), Africa(Egypt, Sudan, Libya, Tunisia, Algeria, Morocco, Ethiopia, Somalia, Kenya, Tanzania, Sierra Leone, Liberia, Cote d'Ivoire, Ghana, Togo, Niger, Nigeria, Cameroon, Gabon, Congo (Brazzaville), Zambia, Zimbabwe, Angola, Mozambique, Botswana, Namibia, South Africa), South Asia(Nepal, Bhutan, India, Pakistan, Bangladesh, Sri Lanka, Maldives) Southeast Asia(Vietnam, Laos, Cambodia, Thailand, Myanmar, Malaysia, Singapore, Indonesia, Brunei, the Philippines, East Timor) Domestic Market(China)
Source: https://www.zgsteamboiler.com/news/how-to-solve-the-over-pressure-problem-of-the-coal-fired-steam-boiler.html
Pre: The reasons for stoping the steam boiler urgently
Next: The measures for safe operation of the steam boiler
Get Price And Support
Simply complete the form below, click submit, you will get the price list and a ZG boiler representative will contact you within one business day. Please also feel free to contact us by email or phone. ( * Denotes a required field ).
Email: [email protected]
Tele: +86 17719993430